[1]
2011. REVIEW ON JOB-SHOP AND FLOW-SHOP SCHEDULING USING. Journal of Mechanical Engineering. 41, 2 (Apr. 2011), 130–146. DOI:https://doi.org/10.3329/jme.v41i2.7508.